Zobrazit minimální záznam



dc.contributor.authorDvořák J.
dc.contributor.authorHanzálek Z.
dc.date.accessioned2020-06-26T07:27:52Z
dc.date.available2020-06-26T07:27:52Z
dc.date.issued2014
dc.identifierV3S-221577
dc.identifier.citationDVOŘÁK, J. and Z. HANZÁLEK. Multi-Variant Time Constrained FlexRay Static Segment Scheduling. In: Proceedings of the 10th IEEE International Workshop on Factory Communication Systems. 10th IEEE International Workshop on Factory Communication Systems, Toulouse, 2014-05-05/2014-05-07. Piscataway: IEEE, 2014. p. 1-8. ISBN 978-1-4799-3235-1. DOI 10.1109/WFCS.2014.6837576.
dc.identifier.urihttp://hdl.handle.net/10467/88838
dc.description.abstractThe FlexRay bus is a modern standard used in the automotive industry. It offers deterministic message transmission with zero jitter while using time-triggered scheduling in the static segment. When several vehicle variants (i.e. different models and their versions) share the same signal, the car manufacturers require to schedule such signal at the same time in all vehicle variants. This requirement simplifies the signal traceability and diagnostics in different vehicle variants using the same platform and simplifies reuse of components and tools. In this paper, we propose a first fit based heuristic algorithm which creates the schedules for several vehicle variants at once, while transmitting a given signal at the same time in all the schedules. The scheduling algorithm also takes the time constraints as release dates and deadlines into account. Finally, different algorithm versions are compared on benchmark sets and low computational time demands are validated on large instances.eng
dc.format.mimetypeapplication/pdf
dc.language.isoeng
dc.publisherIEEE
dc.relation.ispartofProceedings of the 10th IEEE International Workshop on Factory Communication Systems
dc.rightsCreative Commons Attribution-NonCommercial-ShareAlike (CC BY-NC-SA) 4.0
dc.rights.urihttp://creativecommons.org/licenses/by-nc-sa/4.0/
dc.subjectFlexrayeng
dc.subjectstatic segmenteng
dc.subjectmulti-varianteng
dc.subjectscheduling problemeng
dc.subjectbin packingeng
dc.subjecttime constrainedeng
dc.titleMulti-Variant Time Constrained FlexRay Static Segment Schedulingeng
dc.typestať ve sborníkucze
dc.typeconference papereng
dc.identifier.doi10.1109/WFCS.2014.6837576
dc.relation.projectidinfo:eu-repo/grantAgreement/Czech Science Foundation/GA/GAP103%2F12%2F1994/CZ/Adaptive scheduling and Optimization algorithms for distributed Real-Time Embeddes Systems/
dc.rights.accessopenAccess
dc.identifier.wos000356767300001
dc.type.statusPeer-reviewed
dc.type.versionacceptedVersion
dc.identifier.scopus2-s2.0-84903957292
dc.relation.conference10th IEEE International Workshop on Factory Communication Systems


Soubory tohoto záznamu


Tento záznam se objevuje v následujících kolekcích

Zobrazit minimální záznam

Creative Commons Attribution-NonCommercial-ShareAlike (CC BY-NC-SA) 4.0
Kromě případů, kde je uvedeno jinak, licence tohoto záznamu je Creative Commons Attribution-NonCommercial-ShareAlike (CC BY-NC-SA) 4.0