Zobrazit minimální záznam



dc.contributor.authorDrábek, Michal
dc.contributor.authorJanoš, Vít
dc.contributor.authorMichl, Zdeněk
dc.date.accessioned2023-01-18T14:35:27Z
dc.date.available2023-01-18T14:35:27Z
dc.date.issued2016
dc.identifier.citationActa Polytechnica. 2016, vol. 5, no. 0, p. 12-16.
dc.identifier.issn1210-2709 (print)
dc.identifier.issn1805-2363 (online)
dc.identifier.urihttp://hdl.handle.net/10467/105859
dc.description.abstractRegulation (EU) No 1315/2013 defines actual scope of core and comprehensive TEN-T network, including both networks for railway freight transport. For the core network, possibility to operate 740 m long freight trains is required. The aim of this paper is to analyse availability of appropriate overtaking tracks for 740 m long freight trains. Due to ETCS braking curves and odometry, such trains, after ETCS implementation, will require 780-800 m long overtaking tracks. For practical reasons (e.g. bypass lines), whole Czech railway TEN-T network is analysed. The overtaking track, whose occupation means influence on scheduled traffic or threat to boarding passengers, are excluded. The data was collected from station schemes from Collection of Official Requisites for 2015/16 Timetable, issued by SŽDC, Czech state Infrastructure Manager. Most of appropriate tracks are over 800 m long, but their density in the network and in particular directions varies considerably. For freight traffic, gradient of the line is important, so in the resulting figure, there are marked significant peaks for particular lines as well. Czech TEN-T lines are further segmented on the basis of number of tracks and their traffic character. Then, specific issues on overtaking or crossing of 740 m long freight trains are discussed. As a conclusion, for long-term development of Czech TEN-T lines, targeted investment is recommended not only for passenger railway, but also for freight railway. An attractive capacity offer for railway undertakings, which can stimulate freight traffic on European Rail freight corridors, can be represented by network-bound periodic freight train paths with suitable long overtaking tracks outside bottlenecks. After the overtaking by passenger trains, a freight train should run without stop through large node station or a bottleneck area. Before the sections with high gradients, coupling of additional locomotives should be connected with the overtaking process. Next suitable overtaking tracks should be available behind every significant peak of the line.en
dc.format.mimetypeapplication/pdf
dc.language.isoeng
dc.publisherČeské vysoké učení technické v Prazecs
dc.publisherCzech Technical University in Pragueen
dc.relation.ispartofseriesActa Polytechnica
dc.relation.urihttps://ojs.cvut.cz/ojs/index.php/APP/article/view/3830
dc.rightsCreative Commons Attribution 4.0 International Licenseen
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/
dc.titleON OPERATION OF 740 M LONG FREIGHT TRAINS ON CZECH TEN-T RAILWAY NETWORK
dc.typearticleen
dc.date.updated2023-01-18T14:35:27Z
dc.identifier.doi10.14311/APP.2016.5.0012
dc.rights.accessopenAccess
dc.type.statusPeer-reviewed
dc.type.versionpublishedVersion


Soubory tohoto záznamu



Tento záznam se objevuje v následujících kolekcích

Zobrazit minimální záznam

Creative Commons Attribution 4.0 International License
Kromě případů, kde je uvedeno jinak, licence tohoto záznamu je Creative Commons Attribution 4.0 International License