The load-transfer method as a tool for determining the load-displacement curve of piles
Typ dokumentu
articlePeer-reviewed
publishedVersion
Autor
Chalmovský, Juraj
Račanský, Václav
Koudela, Pavel
Zdražil, Karel
Práva
Creative Commons Attribution 4.0 International Licensehttp://creativecommons.org/licenses/by/4.0/
openAccess
Metadata
Zobrazit celý záznamAbstrakt
The paper presents two applications (software packages) in which the load-transfer method is used for axially loaded Kelly drilled bored piles and displacement ductile iron piles. In the first, the ultimate friction is related to the effective stress via the so-called β method. The β method is refined into three stages to cover the variety of soils typical of Central Europe. For the driven piles, a different approach is presented in which the ultimate shaft friction is related to the reference hammering time. The recorded hammering time profile is fed directly into the software based on the load-transfer method. Analyses of five loading tests are presented proving that the load transfer method in combination with the β method or the recorded hammering time profile is able to compute the load-displacement curve of both replacement and displacement piles with a reasonable accuracy in various geological conditions.
Kolekce
K tomuto záznamu jsou přiřazeny následující licenční soubory:
Kromě případů, kde je uvedeno jinak, licence tohoto záznamu je Creative Commons Attribution 4.0 International License