Now showing items 1-1 of 1

    • A HEADRACE TUNNEL RECONSTRUCTION IN TURKEY 

      Author: Hilar, Matouš; Srb, Martin; Nosek, Jakub
      (České vysoké učení technické v PrazeCzech Technical University in Prague, 2019)
      The operation of a hydro power project in North Turkey started in 2015, included the 12km long headrace tunnel. An 8km long lower tunnel section was excavated by double shield TBM technology with 8.7m ID. Due to problems ...