Návrh nového železničního mostu nad stávající železniční tratí
Design of a new railway brige over an existing railway track
Type of document
diplomová prácemaster thesis
Author
Richard Vaněk
Supervisor
Hájek Radek
Opponent
Machač Josef
Field of study
Konstrukce a dopravní stavbyStudy program
Stavební inženýrstvíInstitutions assigning rank
katedra betonových a zděných konstrukcíDefended
2023-02-16Rights
A university thesis is a work protected by the Copyright Act. Extracts, copies and transcripts of the thesis are allowed for personal use only and at one?s own expense. The use of thesis should be in compliance with the Copyright Act http://www.mkcr.cz/assets/autorske-pravo/01-3982006.pdf and the citation ethics http://knihovny.cvut.cz/vychova/vskp.htmlVysokoškolská závěrečná práce je dílo chráněné autorským zákonem. Je možné pořizovat z něj na své náklady a pro svoji osobní potřebu výpisy, opisy a rozmnoženiny. Jeho využití musí být v souladu s autorským zákonem http://www.mkcr.cz/assets/autorske-pravo/01-3982006.pdf a citační etikou http://knihovny.cvut.cz/vychova/vskp.html
Metadata
Show full item recordAbstract
Tato diplomová práce se zabývá návrhem a posouzením dvoukolejného železničního mostu vedeného přes stávající železniční trať a přilehlé pozemní komunikace. V rámci předběžného návrhu bylo zkoumáno několik variant řešení ze kterých byla vybrána finální varianta, která byla v této práci zpracována. Jedná se o typ prefabrikované segmentové konstrukce tvořené betonovou komorovou mostovkou. Most je složen ze tří polí o rozpětí 33,5 + 46,0 + 33,5 m. Jako způsob výstavby byla zvolena metoda montáže po polích s výsuvným zavážecím zařízením. V rámci statického výpočtu je konstrukce navržena a posouzena na mezní stav únosnosti a mezní stav použitelnosti s tím, že speciální důraz je kladen na prověření možnosti zachovat na mostě průběžnou bezstykovou kolej. Součástí výkresové dokumentace jsou podrobné výkresy konstrukce a jejího předpětí. The topic of this diploma thesis is focused on design and analysis of a double-track railway bridge over existing railway track and adjacent roads. In preliminary design there were several options of the bridge considered. From these options the final design was chosen. Construction consists of precast concrete cell girder deck segments. The bridge is devided into three spans of 33,5 + 46,0 + 33,5 m. As a construction method was chosen Span-by-Span method with retractable binding device. Within the static calculation a structure is designed and assessed according to the ultimate limit state (ULS) and the serviceability limit state (SLS). Special attention was given to the possibility to design the bridge to be able to carry continuous welded rail (CWR) traclk according to the current design requirements. Details of construction and prestressing details are included in the technical drawings.
Collections
- Diplomové práce - 11133 [486]
Related items
Showing items related by title, author, creator and subject.
-
Návrh plechobetonové mostovky dálničního mostu
Author: Drozda Jiří; Supervisor: Rotter Tomáš
(České vysoké učení technické v Praze. Vypočetní a informační centrum., 2011-10-14) -
Load rating of masonry arch bridges relativistic scale modeling hypothesis
Author: Posch Marek; Supervisor: Řeřicha Petr; Opponent: Drdácký Miloš
(České vysoké učení technické v Praze. Vypočetní a informační centrum., 2012-11-24)Optimální údržba a využívání stávající dopravní infrastruktury má velký ekonomický význam. Podstatnou její součástí jsou zděné klenbové mosty a propustky pozemních komunikací, jejich stáří je kolem sta let a tomu odpovídá ... -
Thermo-Mechanical Analysis of Charles Bridge in Prague
Author: Toesca Massimo; Supervisor: Krejčí Tomáš
(České vysoké učení technické v Praze. Vypočetní a informační centrum., 2014-07-29)