Zobrazit minimální záznam



dc.contributor.authorHilar , Matous
dc.contributor.authorTuan The, Nhu
dc.date.accessioned2017-02-09T11:41:01Z
dc.date.available2017-02-09T11:41:01Z
dc.date.issued2016
dc.identifier.citationActa Polytechnica. 2016, vol. 56, no. 6, p. 448-454.
dc.identifier.issn1210-2709 (print)
dc.identifier.issn1805-2363 (online)
dc.identifier.urihttp://hdl.handle.net/10467/67294
dc.description.abstractThe new section of the Prague metro V.A is located in the west part of Prague, between stations Dejvická and Motol Hospital. The new metro section is 6.2km long and has four new stations. Majority of the two running tunnels that are 6.2km long were excavated by two EPB (Earth Pressure Balance) shields (2 × 4.8 km), it was the first use of modern tunnelling machines in the Czech Republic. Surface settlement above the running tunnels caused by the EPB shields was regularly monitored. The following paper is focused on an evaluation of the mentioned surface settlement using a volume loss. Consequently, numerical modelling of various cross-sections was executed. Modelling was realised by a finite element method in 2D, using the software Plaxis. Two different approaches were applied for modelling of the 3D effect in 2D. Important parameters Mstage and Cref were derived for the selected cross-sections by back analyses (comparison of the numerical modelling results with the results of monitoring). The results of realised numerical modelling and the volume loss evaluation can be used for a preparation and realisation of similar tunnels in similar geology (for example, construction of the Prague metro line D, which will probably also be excavated by the EPB shields).en
dc.format.mimetypeapplication/pdf
dc.language.isoeng
dc.publisherČeské vysoké učení technické v Prazecs
dc.publisherCzech Technical University in Pragueen
dc.relation.ispartofseriesActa Polytechnica
dc.relation.urihttps://ojs.cvut.cz/ojs/index.php/ap/article/view/3817
dc.rightsCreative Commons Attribution 4.0 International Licenseen
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/
dc.subjectnumerical modelling, tunnel, mechanical excavation, monitoring, settlementen
dc.titleEVALUATION OF THE SURFACE SETTLEMENT ABOVE THE PRAGUE METRO LINE A EXTENSION CONSTRUCTED BY TWO SHIELDS
dc.typearticleen
dc.date.updated2017-02-09T11:41:01Z
dc.identifier.doi10.14311/AP.2016.56.0448
dc.rights.accessopenAccess
dc.type.statusPeer-reviewed
dc.type.versionpublishedVersion


Soubory tohoto záznamu



Tento záznam se objevuje v následujících kolekcích

Zobrazit minimální záznam

Creative Commons Attribution 4.0 International License
Kromě případů, kde je uvedeno jinak, licence tohoto záznamu je Creative Commons Attribution 4.0 International License